Inside a Two-Storey Home: Why Scaffolding Matters for Proper Aluminium Window Repainting



Scaffolding is something most homeowners never really think about until a painting or renovation project suddenly requires it. For exterior work, people expect scaffold or towers to appear around the house. But seeing scaffolding set up inside a two-storey home is different. It surprises people. It immediately raises questions:
Why is it needed?
What makes internal access so difficult?
Why can’t ladders do the same job?
Is it really necessary to repaint aluminium windows?
This article answers those questions fully and uses a real scenario—scaffolding set up inside a two-storey Gold Coast home—to explain why proper access is the foundation of a safe, clean, long-lasting aluminium window repaint. When you see the full breakdown, you understand why professionals rely on internal scaffold systems, especially for tall voids, double-height entries, stairwell windows, and upper-level internal frames.
This 4,000-word guide goes deeper than any surface-level explanation. It explores the real work behind preparation, priming, spraying, masking, overspray control, dust management, safety, and everything else that happens when spraying aluminium windows inside a large home. This is the type of information that proves the quality of the work and gives homeowners confidence in the process long before the spray gun comes out.
—
1. Why Internal Scaffolding Is Needed in So Many Two-Storey Homes
Many modern homes, and a large number of older renovations, have:
double-height foyers
stairwell windows
high clerestory windows
large fixed panels above sliding doors
internal voids that cannot be reached safely
high triangular windows under raked ceilings
metre-high drops from stairs or mezzanines
These architectural features look great but make aluminium window repainting more complex.
Most homeowners assume ladders can do the job. They cannot.
Aluminium window repainting requires:
sanding
cleaning
masking edges to micro accuracy
taping glass tight to avoid paint creep
priming
spraying light tack coats
spraying wet coats
watching overlap and atomisation closely
precise spray angles
A ladder only gives you one fixed position.
Scaffolding gives you:
walkable platforms
safe footing
full reach
two hands free
stable spray angles
consistent distance from the frame
proper body position to mask sharp lines
The scaffold in the picture you provided represents exactly that scenario—an area simply too tall and too awkward to reach with ladders alone.
—
2. Safety Comes Before Anything Else
Painting aluminium windows is intricate work. Doing it at height without a stable platform is unsafe and unprofessional.
Inside a two-storey home, scaffold ensures:
safe movement
fall protection
stable footing for spraying
no leaning dangerously over voids
the ability to use both hands freely
no wobbling or shifting during spraying
Professional aluminium spraying requires the operator to hold the gun at:
a consistent angle
a consistent distance
a consistent pace
with smooth, controlled movement
None of that is possible when balancing on a ladder top step.
Scaffolding also helps protect the home itself.
When ladders are used in high-risk positions, the chance of:
dents
knocks
scratched timber
damaged plasterboard
slipping and hitting walls
is significantly higher.
Scaffolding removes all of these risks.
—
3. The Scaffolding Setup: What Actually Happens
Homeowners are often surprised at how quickly professional scaffold is set up inside a home. In this project, the scaffold was designed to:
span the void safely
allow direct access to upper aluminium frames
keep ground flooring protected
allow space for drop sheets, hoses and equipment
provide uninterrupted reach for sanding and masking
avoid unnecessary contact with walls or balustrades
A typical indoor scaffold setup includes:
1. Castor wheels wrapped or covered to avoid marking floors
2. Protective underlay—carpet protector, drop sheets or foam
3. Frame sections assembled carefully to avoid contact with walls
4. Platforms secured with lock pins
5. Rails added if required
6. Laser levels or eyeballing to ensure balance on the flooring surface
7. Test climbs to ensure stability before tools go up
Because spraying requires smooth movement, the platform height must be exact. A difference of even 10–20 cm affects spray angle. A scaffold makes it possible to stand exactly where the job demands.
—
4. Why Spraying Aluminium Windows Inside Requires More Control Than Outside
Exterior window spraying benefits from ventilation and open space. Overspray drifts away, tack coats flash off more easily, and masking edges behave differently in the sunlight.
Inside, everything is more controlled and more demanding:
air movement is limited
overspray must be contained
dust control must be tight
ventilation is carefully managed
masking must be sealed perfectly
air pressure must be adjusted
drop sheets must be anchored
furniture and flooring must be protected
Spraying inside a two-storey home requires discipline.
The scaffold helps with:
tighter gun control
consistent distance to all edges
more accurate masking
better hand positioning for awkward internal reveals
When spraying upstairs internal frames, the painter must often rotate or adjust their approach mid-pass. Without scaffolding, these movements would be impossible or unsafe.
—
5. Preparation: The Real Work Before Spraying Ever Begins
Most people watching our videos see only the spraying. But the majority of the job happens before paint touches the frame.
For internal aluminium windows on a scaffolded job, the preparation includes:
5.1. A full clean-down of the frame
This removes:
hand oils
cleaning product residue
dust from the upper void
airborne kitchen residues
oxidisation on old powder coat
residue from blinds or shutters
5.2. Full sanding
Sanding is the key to long-term adhesion.
Every frame must be fully abraded, including:
reveals
inside edges
corners
underside folds
fixed panel edges
areas hidden behind blinds
meeting stiles
Scaffolding makes this possible without leaning or stretching dangerously.
5.3. Masking the entire window
Masking includes:
glass edges
mullions
transoms
tiles
carpets
stair rails
surrounding plaster
void flooring below
Scaffold ensures the painter can mask tight, straight lines even at the top of a void where reaching normally is impossible.
—
6. Spraying: Where Scaffolding Directly Improves the Finish
Spraying aluminium isn’t just “painting.”
It is a highly controlled, multi-layer system involving:
primer coats
tack coats
wet coats
drying periods
adjustments for temperature
gun-angle corrections
monitoring film thickness
On scaffold, the painter can:
move smoothly from left to right
maintain consistent gun distance
angle the spray correctly for underside folds
reach the entire frame evenly
avoid over-spraying the top half too heavily
follow the natural lines of the architecture
Without scaffold, the spray pattern becomes inconsistent:
heavy at the bottom
lighter at the top
uneven corners
missed edges
overbuild in some areas
dry spray in others
The scaffold solves all of that.
—
7. Tack Coats – The Critical Transition Layer
Your previous posts have covered tack coats in depth, and this applies just as much inside a scaffolded home.
The tack coat:
prevents runs
creates surface tension
prepares the primer for the wet coat
locks down micro dust
smooths out the absorptive differences
improves gloss flow
Inside a two-storey home, tack coat control is even more important because:
air is still
humidity changes throughout the day
overspray can settle differently
lighting affects visibility of wet edge
When you’re standing on a scaffold platform, the tack coat technique needs to be even more precise because any mistake is amplified by the indoor lighting.
—
8. Wet Coats and the Final Lacquer Layer
Once the tack coat flashes off, the wet coats are applied.
Inside a high void environment, this requires:
discipline in pacing
correct overlap
maintaining distance from all edges
spraying around internal reveals
controlling atomisation
The scaffold ensures the painter can walk the platform naturally, allowing for natural arm movement and steady rhythm.
Inside voids, white or black lacquer shows imperfections easily.
Even semi-gloss finishes require perfectly even application.
This is why internal scaffold is formed first—so the finish is not compromised.
—
9. Overspray Containment and Dust Control Inside a Home
Spraying inside a two-storey home means overspray must not:
land on stair treads
drift onto furniture
settle on balustrades
fog onto glass balusters
contaminate flooring
affect smoke alarms or sensors
Overspray control includes:
sheeting drop zones
sealed masking around void edges
pressure adjustments
controlled fan patterns
limiting unnecessary air movement
Scaffolding gives the painter a stable, predictable base from which to control the mist.
Without scaffold, the painter is moving, twisting or leaning—each creating unpredictable spray behaviour.
—
10. Accessing the Top of the Window Frame Properly
Many homeowners don’t realise that the top edge of a window frame is one of the most important areas in terms of adhesion and final finish.
Inside a two-storey void, the top frame edge can be several metres above the ground. That edge must:
be sanded
be cleaned
be primed
receive the tack coat evenly
receive full wet coats
be inspected after drying
Scaffolding allows the painter to reach the top edge safely and directly.
A ladder allows only one fixed point of access, making perfect top-edge spraying impossible.
—
11. Tape Removal and Why Internal Scaffolding Helps
When tape comes off, the entire job is exposed.
If someone cannot reach the top edges or upper sides safely, tape removal becomes:
dangerous
inaccurate
rushed
likely to cause paint lifting
likely to result in torn edges
On scaffold, tape is removed while standing safely and steadily, ensuring:
razor-straight lines
no pulled paint
no missed masking
clean reveals
Tape removal videos are often the most revealing part of any project.
They show the precision of the masking and the accuracy of the spray pattern.
—
12. Reinstalling Internal Screens, Curtains and Tracks
Once the internal spraying is complete and the scaffold is removed, we reinstall:
flyscreens
security screens (if internal removal was required)
blinds
curtain rods
window furnishings
Internal windows often have:
plantation shutters
tall drapery
high blinds
decorative balustrades nearby
All must be protected before spraying and returned to normal after drying.
—
13. Why Spraying Aluminium Internally Produces a Factory-Level Finish
Aluminium responds best to:
sanding
priming
tack coating
lacquer spraying
This is the same approach used in factory production—controlled layers, cured properly.
Brushing or rolling cannot recreate this.
Ladders cannot provide the stability for it.
Shortcuts show instantly in sunlight or indoor lighting.
The scaffold ensures the finish looks:
smooth
even
straight
professionally applied
completely modern
This is why professional access systems matter.
—
14. Why Homeowners Appreciate the Internal Scaffolding Approach
Homeowners often tell us:
“I didn’t realise how much work goes into this.”
or
“I thought window painting meant just taping the glass and spraying it.”
or
“I had no clue you’d need a whole scaffold inside just to reach those windows.”
Internal scaffolding shows the homeowner:
the professionalism of the work
the safety protocols
the respect for the home
the detail required to get factory-quality finishes
the real skill behind aluminium spraying
It also reassures them that nothing is rushed or improvised.
—
15. Suburbs Where Internal Scaffolding Is Common
Indoor scaffolding is required regularly in:
Mudgeeraba
Robina
Reedy Creek
Varsity Lakes
Burleigh Waters
Coomera
Pacific Pines
Hope Island
Sanctuary Cove
Runaway Bay
Clear Island Waters
Broadbeach Waters
These suburbs have tall voids and architectural windows that require proper access.
—
16. This Process Protects the Home and the Result
Internal scaffolding ensures:
the home remains undamaged
the painter can work accurately
the finish remains consistent
safety is maintained
overspray is managed
edges are crisp
the primer bonds properly
lacquer cures evenly
Without it, the job would be unsafe and results would suffer.
—
17. Final Outcome
The scaffold is temporary, but the results are permanent.
Once the scaffold was removed, the windows appeared:
smooth
modern
evenly coated
free of brush marks
free of uneven gloss
perfect against the surrounding architecture
The transformation was immediate.
The home looked newer, brighter, and more cohesive.
The frames now matched the rest of the interior finishes, completing the renovation.

Stephen Lockyer
Professional painters and Decorators on the Gold Coast. Serving all your interior and exterior painting needs.
Social Share










































































































































































